Harry W Nice/Thomas “Mac” Middleton Bridge

Client

Maryland DOT

Owner

United Infrastructure Group

about

  • Construction (demolition) engineering for highway bridge
  • Developed complex procedures to facilitate the demolition of multiple bridge structures including demolition equipment on bridge, structure dismantling sequence, and temporary works design to maintain structural stability 
  • Performed complex finite element analysis to evaluate existing structure for construction operations such as inertial effects induced by explosive demolition  

Services Provided

Falsework, Heavy Civil, Highway Bridges, Temporary Work

Completion

2024

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

MDOT S10 Bridge Deck Removal

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

SH249 / SH99 Interchange

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement