Daniel Carter Bridge Rehabilitation
Client
The Great Lakes Construction Co.
Owner
Ohio Department of Transportation
Location
Cincinnati, Ohio
about
- Analysis of damage from an extreme thermal loading event on steel girders and deck.
- Development and evaluation of demolition procedures of damaged deck with variable equipment loading
- Development and evaluation of partial steel girder removal
Services Provided
Falsework, Heavy Civil, Temporary Work
Completion
2025
Screenshot 2026-04-21 080200
IMG_0491
IMG_9244
IMG_9354
IMG_9360
Other Projects
Hawk Falls Bridge
Portal North Bridge Erection
Belden G. Bly Bridge Replacement
Buck O’Neil Bridge Replacement
Ramp G (KDOT Br. 854) Construction
SH249 / SH99 Interchange
McClugage Bridge
Loxahatchee River Bridge Flying Jump Span
I-30 Bridge Demolition
Lewis and Clark Viaduct Replacement
I-75 over Rouge River Deck Removal
Champ Clark Bridge over the Mississippi River
Commonwealth Avenue Bridge Replacement
Daniel Carter Bridge Rehabilitation
Route 17 Pier Demolition
I-475 Bridge Rehabilitation
Repairs to Old Hwy 182 over the Tuscumbia River
Harry W Nice/Thomas “Mac” Middleton Bridge
FMM Tainter Gate Construction
Hungry Horse Replacement of 5 Cranes
Kentucky Lock Addition Downstream Lock Excavation
LIRR 150th Street Bridge Launch
Second Ave North Approach – Br. S01 Girder Erection
OCCI A-Frame Derrick Design
Margaret McDermott Pedestrian Bridges
Miller Road / Rotunda Drive Bridge Demolition
Amelia Earhart Bridge
Mobile River Bridge and Byway Project
I-29 Girder Jacking – LiDAR Scanning
Laredo-to-Nuevo Structures
Gordie Howe International Bridge
Point-No-Point Bascule Bridge
Hwy 63 Girder Jacking LiDAR Scanning
BNSF Bridge 66.4 over Little Salmon River
Wind River Truss Replacement
TRRA Merchants Bridge
KY 152 Kennedy Mill Bridge replacement
BNSF Des Allemands Swing Span Replacement
Long Island Bridge Demolition
I-35 / I-435 Gateway Flyover Bridge
Broadway Bridge
CSX Bridge 64 over the Potomac River
Fort Street Bridge
John Greenleaf Whittier Memorial Bridge
Fore River Lift Bridge
Memorial Bridge
Torrence Avenue Truss
Burlington Approach Span Demolition
Paseo Bridge Demolition
Center Street Bridge / Iowa Women of Achievement Bridge
BOB KERREY PEDESTRIAN BRIDGE
U.S. 90 over Biloxi Bay Bridge
Upper Kate Shelley Bridge
Missouri River at Hermann
Huey P. Long Bridge
Bagley Avenue Pedestrian Bridge
MLK Bridge Replacement
West Third Lift Bridge Replacement
Wichita Riverfront Pedestrian Bridges
Hawk Falls Bridge
Portal North Bridge Erection
Belden G. Bly Bridge Replacement
Buck O’Neil Bridge Replacement
Ramp G (KDOT Br. 854) Construction
SH249 / SH99 Interchange
McClugage Bridge
I-30 Bridge Demolition
Lewis and Clark Viaduct Replacement
I-75 over Rouge River Deck Removal
Champ Clark Bridge over the Mississippi River
Commonwealth Avenue Bridge Replacement
Daniel Carter Bridge Rehabilitation
Route 17 Pier Demolition
I-475 Bridge Rehabilitation
Repairs to Old Hwy 182 over the Tuscumbia River
Harry W Nice/Thomas “Mac” Middleton Bridge
FMM Tainter Gate Construction
LIRR 150th Street Bridge Launch
Second Ave North Approach – Br. S01 Girder Erection
Margaret McDermott Pedestrian Bridges
Miller Road / Rotunda Drive Bridge Demolition
Amelia Earhart Bridge
Mobile River Bridge and Byway Project
I-29 Girder Jacking – LiDAR Scanning
Laredo-to-Nuevo Structures
Gordie Howe International Bridge
Point-No-Point Bascule Bridge
Hwy 63 Girder Jacking LiDAR Scanning
BNSF Bridge 66.4 over Little Salmon River
Wind River Truss Replacement
TRRA Merchants Bridge
KY 152 Kennedy Mill Bridge replacement
BNSF Des Allemands Swing Span Replacement
Long Island Bridge Demolition
I-35 / I-435 Gateway Flyover Bridge
Broadway Bridge
CSX Bridge 64 over the Potomac River
Fort Street Bridge
John Greenleaf Whittier Memorial Bridge
Fore River Lift Bridge
Memorial Bridge
Torrence Avenue Truss
Burlington Approach Span Demolition
Paseo Bridge Demolition
Center Street Bridge / Iowa Women of Achievement Bridge
BOB KERREY PEDESTRIAN BRIDGE
U.S. 90 over Biloxi Bay Bridge
Upper Kate Shelley Bridge
Missouri River at Hermann
Huey P. Long Bridge
Bagley Avenue Pedestrian Bridge
MLK Bridge Replacement
West Third Lift Bridge Replacement
Wichita Riverfront Pedestrian Bridges
Hawk Falls Bridge
Portal North Bridge Erection
Belden G. Bly Bridge Replacement
SH249 / SH99 Interchange
Loxahatchee River Bridge Flying Jump Span
Lewis and Clark Viaduct Replacement
Champ Clark Bridge over the Mississippi River
Commonwealth Avenue Bridge Replacement
Daniel Carter Bridge Rehabilitation
I-475 Bridge Rehabilitation
Repairs to Old Hwy 182 over the Tuscumbia River
Harry W Nice/Thomas “Mac” Middleton Bridge
Hungry Horse Replacement of 5 Cranes
Kentucky Lock Addition Downstream Lock Excavation
LIRR 150th Street Bridge Launch
OCCI A-Frame Derrick Design
Mobile River Bridge and Byway Project
Laredo-to-Nuevo Structures
Point-No-Point Bascule Bridge
BNSF Des Allemands Swing Span Replacement
Long Island Bridge Demolition
John Greenleaf Whittier Memorial Bridge
Fore River Lift Bridge
Memorial Bridge
Torrence Avenue Truss
Burlington Approach Span Demolition
Huey P. Long Bridge
Hawk Falls Bridge
Portal North Bridge Erection
Belden G. Bly Bridge Replacement
Buck O’Neil Bridge Replacement
Ramp G (KDOT Br. 854) Construction
SH249 / SH99 Interchange
McClugage Bridge
I-30 Bridge Demolition
Lewis and Clark Viaduct Replacement
I-75 over Rouge River Deck Removal
Champ Clark Bridge over the Mississippi River
Commonwealth Avenue Bridge Replacement
Daniel Carter Bridge Rehabilitation
Route 17 Pier Demolition
I-475 Bridge Rehabilitation
Repairs to Old Hwy 182 over the Tuscumbia River
Harry W Nice/Thomas “Mac” Middleton Bridge
FMM Tainter Gate Construction
Second Ave North Approach – Br. S01 Girder Erection
Miller Road / Rotunda Drive Bridge Demolition
Mobile River Bridge and Byway Project
Laredo-to-Nuevo Structures
Gordie Howe International Bridge
Point-No-Point Bascule Bridge
Center Street Bridge / Iowa Women of Achievement Bridge
BOB KERREY PEDESTRIAN BRIDGE
U.S. 90 over Biloxi Bay Bridge
Upper Kate Shelley Bridge
Missouri River at Hermann
Huey P. Long Bridge
Bagley Avenue Pedestrian Bridge