Commonwealth Avenue Bridge Replacement

Client

Walsh Construction 

Owner

MASSDOT

Location

Boston, MA

about

  • Replacement of the Commonwealth Ave Bridge took place over two separate two-week closures during the summers of 2017/2018. Crews worked around the clock to perform superstructure removal and replacement of three separate skewed steel girder simple-spans.
  • Substructures were reused. 
  • Demolition Engineering for existing deck and skewed steel girders. 
  • Erection Engineering and Crane Planning for replacement skewed steel girders. 
  • Rigging design for skewed pairs and girder singles 

Services Provided

Falsework, Heavy Civil, Highway Bridges, Specialty Rigging, Temporary Works

Completion

2019

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

MDOT S10 Bridge Deck Removal

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

SH249 / SH99 Interchange

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement

Portal North Bridge Erection 

Ramp G (KDOT Br. 854) Construction

McClugage Bridge 

Loxahatchee River Bridge Flying Jump Span

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement