about

  • Performed demolition analysis of the existing Piers to be demolished while still under the existing Rte 17 bridge over  of the Waccamaw River. 
  • Developed required falsework to facilitate the sequential lowering of the existing pier caps 
  • Provided barge stability analysis for crane barge and demolition materials barge.

Services Provided

Crane on Barge, Falsework, Highway Bridges, Specialty Rigging, Temporary Construction Bridge, Temporary Work

Completion

2009

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

MDOT S10 Bridge Deck Removal

Howard Frankland Demolition

Route 17 Pier Demolition 

I-74 Demolition & LiDAR Scanning 

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement

Portal North Bridge Erection 

Ramp G (KDOT Br. 854) Construction

McClugage Bridge 

Loxahatchee River Bridge Flying Jump Span

Portal North Bridge Erection 

Loxahatchee River Bridge Flying Jump Span

Lewis and Clark Viaduct Replacement

Route 17 Pier Demolition 

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement