Repairs to Old Hwy 182 over the Tuscumbia River
Client
Malouf Construction
Owner
City of Columbus, MS
Location
Columbus, MS
about
- Develop temporary support for approach spans to facilitate removal of the existing damaged concrete pier
- Design temporary dewatering falsework to allow for drilled shaft installation and preparation
- Design floating support system to deliver new precast pier cap to jobsite and set into place.
- Field Support
Services Provided
Bridge Float-In/Float-Out, Falsework, Heavy Civil, Highway Bridges, Pedestrian Bridges, Temporary Construction Bridge, Temporary Work
Completion
2024
IMG_4098
IMG_4078
IMG_0589
IMG_4089
IMG_0589
default
Other Projects
Hawk Falls Bridge
Portal North Bridge Erection
Belden G. Bly Bridge Replacement
MDOT S10 Bridge Deck Removal
Buck O’Neil Bridge Replacement
Ramp G (KDOT Br. 854) Construction
SH249 / SH99 Interchange
McClugage Bridge
Loxahatchee River Bridge Flying Jump Span
I-30 Bridge Demolition
Lewis and Clark Viaduct Replacement
I-75 over Rouge River Deck Removal
Champ Clark Bridge over the Mississippi River
Dublin Link Pedestrian Bridge
Commonwealth Avenue Bridge Replacement
Daniel Carter Bridge Rehabilitation
Route 17 Pier Demolition
I-475 Bridge Rehabilitation
Repairs to Old Hwy 182 over the Tuscumbia River
Harry W Nice/Thomas “Mac” Middleton Bridge
Maffa Way & Mystic Avenue
FMM Tainter Gate Construction
Hungry Horse Replacement of 5 Cranes
Kentucky Lock Addition Downstream Lock Excavation
LIRR 150th Street Bridge Launch
General Concrete Forming
MDOT I-696 – Z03 Demolition
US Route 20 over Cazenovia Creek
Second Ave North Approach – Br. S01 Girder Erection
OCCI A-Frame Derrick Design
Margaret McDermott Pedestrian Bridges
Miller Road / Rotunda Drive Bridge Demolition
Amelia Earhart Bridge
Mobile River Bridge and Byway Project
Colbern Rd Demolition – LiDAR Scanning
I-29 Girder Jacking – LiDAR Scanning
Laredo-to-Nuevo Structures
I-74 Demolition & LiDAR Scanning
Gordie Howe International Bridge
Point-No-Point Bascule Bridge
Hwy 63 Girder Jacking LiDAR Scanning
BNSF Bridge 66.4 over Little Salmon River
Wind River Truss Replacement
TRRA Merchants Bridge
KY 152 Kennedy Mill Bridge replacement
Sarah Long Bridge Demolition
Mockingbird Pedestrian Bridge
BNSF Des Allemands Swing Span Replacement
Long Island Bridge Demolition
I-35 / I-435 Gateway Flyover Bridge
Broadway Bridge
CSX Bridge 64 over the Potomac River
Fort Street Bridge
John Greenleaf Whittier Memorial Bridge
Fore River Lift Bridge
Memorial Bridge
Torrence Avenue Truss
Burlington Approach Span Demolition
Paseo Bridge Demolition
Center Street Bridge / Iowa Women of Achievement Bridge
BOB KERREY PEDESTRIAN BRIDGE
U.S. 90 over Biloxi Bay Bridge
Upper Kate Shelley Bridge
Missouri River at Hermann
Huey P. Long Bridge
Bagley Avenue Pedestrian Bridge
Margaret Hunt Hill Bridge
Oletangy River Pedestrian Bridge
I-235 Pedestrian Bridges
MLK Bridge Replacement
Rigolets Pass Bridge
West Main Street Bridge over Alum Creek
West Third Lift Bridge Replacement
Wichita Riverfront Pedestrian Bridges
Portal North Bridge Erection
McClugage Bridge
Repairs to Old Hwy 182 over the Tuscumbia River
BNSF Bridge 66.4 over Little Salmon River
Wind River Truss Replacement
TRRA Merchants Bridge
Sarah Long Bridge Demolition
BNSF Des Allemands Swing Span Replacement
Long Island Bridge Demolition
Broadway Bridge
Burlington Approach Span Demolition
West Third Lift Bridge Replacement
Hawk Falls Bridge
Portal North Bridge Erection
Belden G. Bly Bridge Replacement
Buck O’Neil Bridge Replacement
Ramp G (KDOT Br. 854) Construction
SH249 / SH99 Interchange
McClugage Bridge
I-30 Bridge Demolition
Lewis and Clark Viaduct Replacement
I-75 over Rouge River Deck Removal
Champ Clark Bridge over the Mississippi River
Commonwealth Avenue Bridge Replacement
Daniel Carter Bridge Rehabilitation
Route 17 Pier Demolition
I-475 Bridge Rehabilitation
Repairs to Old Hwy 182 over the Tuscumbia River
Harry W Nice/Thomas “Mac” Middleton Bridge
FMM Tainter Gate Construction
LIRR 150th Street Bridge Launch
Second Ave North Approach – Br. S01 Girder Erection
Margaret McDermott Pedestrian Bridges
Miller Road / Rotunda Drive Bridge Demolition
Amelia Earhart Bridge
Mobile River Bridge and Byway Project
I-29 Girder Jacking – LiDAR Scanning
Laredo-to-Nuevo Structures
Gordie Howe International Bridge
Point-No-Point Bascule Bridge
Hwy 63 Girder Jacking LiDAR Scanning
BNSF Bridge 66.4 over Little Salmon River
Wind River Truss Replacement
TRRA Merchants Bridge
KY 152 Kennedy Mill Bridge replacement
BNSF Des Allemands Swing Span Replacement
Long Island Bridge Demolition
I-35 / I-435 Gateway Flyover Bridge
Broadway Bridge
CSX Bridge 64 over the Potomac River
Fort Street Bridge
John Greenleaf Whittier Memorial Bridge
Fore River Lift Bridge
Memorial Bridge
Torrence Avenue Truss
Burlington Approach Span Demolition
Paseo Bridge Demolition
Center Street Bridge / Iowa Women of Achievement Bridge
BOB KERREY PEDESTRIAN BRIDGE
U.S. 90 over Biloxi Bay Bridge
Upper Kate Shelley Bridge
Missouri River at Hermann
Huey P. Long Bridge
Bagley Avenue Pedestrian Bridge
MLK Bridge Replacement
West Third Lift Bridge Replacement
Wichita Riverfront Pedestrian Bridges
Hawk Falls Bridge
Portal North Bridge Erection
Belden G. Bly Bridge Replacement
SH249 / SH99 Interchange
Loxahatchee River Bridge Flying Jump Span
Lewis and Clark Viaduct Replacement
Champ Clark Bridge over the Mississippi River
Commonwealth Avenue Bridge Replacement
Daniel Carter Bridge Rehabilitation
I-475 Bridge Rehabilitation
Repairs to Old Hwy 182 over the Tuscumbia River
Harry W Nice/Thomas “Mac” Middleton Bridge
Hungry Horse Replacement of 5 Cranes
Kentucky Lock Addition Downstream Lock Excavation
LIRR 150th Street Bridge Launch
OCCI A-Frame Derrick Design
Mobile River Bridge and Byway Project
Laredo-to-Nuevo Structures
Point-No-Point Bascule Bridge
BNSF Des Allemands Swing Span Replacement
Long Island Bridge Demolition
John Greenleaf Whittier Memorial Bridge
Fore River Lift Bridge
Memorial Bridge
Torrence Avenue Truss
Burlington Approach Span Demolition
Huey P. Long Bridge
Hawk Falls Bridge
Portal North Bridge Erection
MDOT S10 Bridge Deck Removal
Buck O’Neil Bridge Replacement
Ramp G (KDOT Br. 854) Construction
SH249 / SH99 Interchange
McClugage Bridge
I-30 Bridge Demolition
Lewis and Clark Viaduct Replacement
I-75 over Rouge River Deck Removal
Champ Clark Bridge over the Mississippi River
Commonwealth Avenue Bridge Replacement
Route 17 Pier Demolition
I-475 Bridge Rehabilitation
Repairs to Old Hwy 182 over the Tuscumbia River
Harry W Nice/Thomas “Mac” Middleton Bridge
Maffa Way & Mystic Avenue
General Concrete Forming
MDOT I-696 – Z03 Demolition
US Route 20 over Cazenovia Creek
Second Ave North Approach – Br. S01 Girder Erection
Margaret McDermott Pedestrian Bridges
Miller Road / Rotunda Drive Bridge Demolition
Amelia Earhart Bridge
Mobile River Bridge and Byway Project
Colbern Rd Demolition – LiDAR Scanning
I-29 Girder Jacking – LiDAR Scanning
I-74 Demolition & LiDAR Scanning
Gordie Howe International Bridge
Hwy 63 Girder Jacking LiDAR Scanning
KY 152 Kennedy Mill Bridge replacement
BNSF Des Allemands Swing Span Replacement
Long Island Bridge Demolition
I-35 / I-435 Gateway Flyover Bridge
Broadway Bridge
John Greenleaf Whittier Memorial Bridge
Fore River Lift Bridge
Torrence Avenue Truss
Paseo Bridge Demolition
Missouri River at Hermann
Huey P. Long Bridge
Margaret Hunt Hill Bridge
Rigolets Pass Bridge
West Main Street Bridge over Alum Creek
Ramp G (KDOT Br. 854) Construction
Dublin Link Pedestrian Bridge
Repairs to Old Hwy 182 over the Tuscumbia River
Margaret McDermott Pedestrian Bridges
Mockingbird Pedestrian Bridge
Center Street Bridge / Iowa Women of Achievement Bridge
BOB KERREY PEDESTRIAN BRIDGE
Bagley Avenue Pedestrian Bridge
Oletangy River Pedestrian Bridge
I-235 Pedestrian Bridges
Wichita Riverfront Pedestrian Bridges
Portal North Bridge Erection
Loxahatchee River Bridge Flying Jump Span
Lewis and Clark Viaduct Replacement
Route 17 Pier Demolition
Repairs to Old Hwy 182 over the Tuscumbia River
Laredo-to-Nuevo Structures
Upper Kate Shelley Bridge
Hawk Falls Bridge
Portal North Bridge Erection
Belden G. Bly Bridge Replacement
Buck O’Neil Bridge Replacement
Ramp G (KDOT Br. 854) Construction
SH249 / SH99 Interchange
McClugage Bridge
I-30 Bridge Demolition
Lewis and Clark Viaduct Replacement
I-75 over Rouge River Deck Removal
Champ Clark Bridge over the Mississippi River
Commonwealth Avenue Bridge Replacement
Daniel Carter Bridge Rehabilitation
Route 17 Pier Demolition
I-475 Bridge Rehabilitation
Repairs to Old Hwy 182 over the Tuscumbia River
Harry W Nice/Thomas “Mac” Middleton Bridge
FMM Tainter Gate Construction
Second Ave North Approach – Br. S01 Girder Erection
Miller Road / Rotunda Drive Bridge Demolition
Mobile River Bridge and Byway Project
Laredo-to-Nuevo Structures
Gordie Howe International Bridge
Point-No-Point Bascule Bridge
Center Street Bridge / Iowa Women of Achievement Bridge
BOB KERREY PEDESTRIAN BRIDGE
U.S. 90 over Biloxi Bay Bridge
Upper Kate Shelley Bridge
Missouri River at Hermann
Huey P. Long Bridge
Bagley Avenue Pedestrian Bridge
