Mobile River Bridge and Byway Project

Client

Kiewit-Massman-Traylor JV

Owner

Alabama Department of Transportation (ALDOT)

Location

Mobile, AL

about

  • Designed Reaction Frame to resist/support design pile test load of 8,000 kips in accordance with project specifcations
  • Custom Plate Girders and custom box girders. Deflection control/considerations to properly size hydraulic jacks.
  • Performed Eigenvalue Buckling Analysis of Reaction Frame 
  • Designed connection for variable connection geometry due to allowed pile installation tolerances.
  • On-site field inspection

Services Provided

Falsework, Heavy Civil, Highway Bridges, Temporary Work

Completion

2025

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

MDOT S10 Bridge Deck Removal

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

SH249 / SH99 Interchange

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement