Mobile River Bridge and Byway Project
Client
Kiewit-Massman-Traylor JV
Owner
Alabama Department of Transportation (ALDOT)
Location
Mobile, AL
about
- Designed Reaction Frame to resist/support design pile test load of 8,000 kips in accordance with project specifcations
- Custom Plate Girders and custom box girders. Deflection control/considerations to properly size hydraulic jacks.
- Performed Eigenvalue Buckling Analysis of Reaction Frame
- Designed connection for variable connection geometry due to allowed pile installation tolerances.
- On-site field inspection
Services Provided
Falsework, Heavy Civil, Highway Bridges, Temporary Work
Completion
2025