West Third Lift Bridge Replacement

Client

Tri-State Steel Construction, Inc.

Owner

City of Cleveland

Location

Cleveland, Ohio

about

  • Demolition sequencing for the existing truss removal 
  • Development of barge stability calculations for the float-in of new and float-out of existing truss 
  • Development of balance calculations for CTWT concrete design 
  • On-site construction services 
  • Design of all falsework and cribbing on barges 

Services Provided

  • Falsework and Temporary Works

  • Movable bridges  

  • Bridge Float-In / Float-Out 

Completion

2006

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Portal North Bridge Erection 

McClugage Bridge 

Repairs to Old Hwy 182 over the Tuscumbia River 

BNSF Bridge 66.4 over Little Salmon River 

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Belden G. Bly Bridge Replacement

Loxahatchee River Bridge Flying Jump Span

Point-No-Point Bascule Bridge

Sarah Long Bridge Demolition