Portal North Bridge Erection 

Client

Skanska Traylor Joint Venture

Owner

NJ Transit

Location

Secaucus, NJ

about

  • Staged analysis for arch erection on temporary falsework at an offsite marine facility
  • Designed strut system to allow arch to be picked up with SPMT’s  
  • Designed roll-on procedure to roll SPMT’s onto a deck barge 
  • Designed heavy lift jacking barge 
  • Designed longitudinally slid system to slide bridge 100ft to the final bearing locations 

Services Provided

Bridge Float-In/Float-Out, Cable Supported Bridges, Falsework, Geometry Control, Heavy Civil, Highway Bridges, Railroad Bridge, Specialty Rigging, Temporary Construction Bridge, Temporary Shoring Bridge, Temporary Work

Completion

2026

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

MDOT S10 Bridge Deck Removal

Portal North Bridge Erection 

McClugage Bridge 

Repairs to Old Hwy 182 over the Tuscumbia River 

BNSF Bridge 66.4 over Little Salmon River 

Portal North Bridge Erection 

McClugage Bridge 

Dublin Link Pedestrian Bridge 

I-74 Demolition & LiDAR Scanning 

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

SH249 / SH99 Interchange

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement

Portal North Bridge Erection 

Loxahatchee River Bridge Flying Jump Span

LIRR 150th Street Bridge Launch

Laredo-to-Nuevo Structures

Portal North Bridge Erection 

Ramp G (KDOT Br. 854) Construction

McClugage Bridge 

Loxahatchee River Bridge Flying Jump Span

Portal North Bridge Erection 

Loxahatchee River Bridge Flying Jump Span

Lewis and Clark Viaduct Replacement

Route 17 Pier Demolition 

Portal North Bridge Erection 

Buck O’Neil Bridge Replacement

Ramp G (KDOT Br. 854) Construction

I-30 Bridge Demolition

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement