KY 152 Kennedy Mill Bridge replacement 

Client

Walsh Construction 

Owner

Kentucky Transportation Cabinet 

Location

Harrodsburg, KY 

about

  • Engineered a floating platform and lowering system used for construction of the center pier located in a 200-ft deep section of the lake.
  • Staged erection analysis of new bridge construction.
  • Single girder and system buckling analysis performed for critical stages of steel girder erection.
  • Falsework tower design for construction of new girders.
  • Stability of barges during truss span removal.

Services Provided

Falsework & Temporary Works, Highway Bridge, Crane on Barge

Completion

2018

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

MDOT S10 Bridge Deck Removal

KY 152 Kennedy Mill Bridge replacement 

Walsh Barge Crane Stability Analysis

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement