KY 152 Kennedy Mill Bridge replacement
Client
Walsh Construction
Owner
Kentucky Transportation Cabinet
Location
Harrodsburg, KY
about
- Engineered a floating platform and lowering system used for construction of the center pier located in a 200-ft deep section of the lake.
- Staged erection analysis of new bridge construction.
- Single girder and system buckling analysis performed for critical stages of steel girder erection.
- Falsework tower design for construction of new girders.
- Stability of barges during truss span removal.
Services Provided
Falsework & Temporary Works, Highway Bridge, Crane on Barge
Completion
2018