Gordie Howe International Bridge
Client
Bridging North America (BNA)
Owner
Windsor–Detroit Bridge Authority (WDBA)
Location
Detroit, MI
about
- Designed and developed the erection sequence for the curved approach spans, which consisted of 10 girders, 9 spans, and nearly 1800ft of total bridge length.
- Engineered pier brackets to be installed at pier locations to facilitate girder erection.
- Developed picking and rigging plans for all 140 girders.
Services Provided
Falsework, Geometry Control, Highway Bridges, Temporary Work
Completion
2025