Belden G. Bly Bridge Replacement
Client
SPS New England and Saugus Construction
Owner
Massachusetts Department
of Transportation
Location
Boston, MA
about
- Engineered the steel erection plan for the moveable bridge
- Developed a 3D FEA model of the entire structure to validate structure stiffness for erection
- Performed geometry studies of key work points for fit-up during erection.
- Designed large stroke custom falsework for CTWT Construction
Services Provided
Falsework, Geometry Control, Heavy Civil, Moveable Bridges, Temporary Work