Buck O’Neil Bridge Replacement

Client

Massman Construction Company

Owner

Missouri Department
of Transportation

Location

Kansas City, MO

about

  • Crane Layout, Adequacy & Clearance Studies for Precast Girder Erection
  • Demolition Analysis of Existing Concrete Deck, Plate Girder & Arch Spans
  • Arch Span Pre-Cut & Post-Blast Structural Evaluation
  • Transient Dynamic Analysis of Partial North Arch Following Explosive Demolition
  • Temporary Falsework Design for Dynamic Loads from Remaining Arch Structure
  • Pick Weight & Center-of-Gravity Analysis for Single and Paired Girder Lifts
  • Railroad-Adjacent Excavation Shoring Design for New Bridge Bent Construction
  • Existing Bridge LIDAR Survey & Modeling

Services Provided

Falsework, Geometry Control, Highway Bridges, Temporary Shoring Structures, Temporary Work

Completion

2025

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

MDOT S10 Bridge Deck Removal

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement

Portal North Bridge Erection 

Buck O’Neil Bridge Replacement

Ramp G (KDOT Br. 854) Construction

I-30 Bridge Demolition

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement