Buck O’Neil Bridge Replacement
Client
Massman Construction Company
Owner
Missouri Department
of Transportation
Location
Kansas City, MO
about
- Crane Layout, Adequacy & Clearance Studies for Precast Girder Erection
- Demolition Analysis of Existing Concrete Deck, Plate Girder & Arch Spans
- Arch Span Pre-Cut & Post-Blast Structural Evaluation
- Transient Dynamic Analysis of Partial North Arch Following Explosive Demolition
- Temporary Falsework Design for Dynamic Loads from Remaining Arch Structure
- Pick Weight & Center-of-Gravity Analysis for Single and Paired Girder Lifts
- Railroad-Adjacent Excavation Shoring Design for New Bridge Bent Construction
- Existing Bridge LIDAR Survey & Modeling
Services Provided
Falsework, Geometry Control, Highway Bridges, Temporary Shoring Structures, Temporary Work
Completion
2025