I-30 Bridge Demolition

Client

Kiewit-Massman

Owner

Arkansas Department
of Transportation

Location

Little Rock, Arkansas

about

  • Deck and girder removal sequence for built-up plate girder bridge 
  • Design temporary post-tensioned corbel and pier bracket for supporting remaining girder segments 
  • Design temporary shoring tower and stability bracing 
  • Design temporary strongback beam support for girder removal 
  • Lifting and rigging analysis and design of unique lifting lugs 

Services Provided

Falsework, Highway Bridges, Specialty Rigging, Temporary Shoring Structures, Temporary Work

Completion

2023

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

MDOT S10 Bridge Deck Removal

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement

Portal North Bridge Erection 

Ramp G (KDOT Br. 854) Construction

McClugage Bridge 

Loxahatchee River Bridge Flying Jump Span

Portal North Bridge Erection 

Buck O’Neil Bridge Replacement

Ramp G (KDOT Br. 854) Construction

I-30 Bridge Demolition

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement