Repairs to Old Hwy 182 over the Tuscumbia River 

Client

Malouf Construction

Owner

City of Columbus, MS 

Location

Columbus, MS 

about

  • Develop temporary support for approach spans to facilitate removal of the existing damaged concrete pier 
  • Design temporary dewatering falsework to allow for drilled shaft installation and preparation 
  • Design floating support system to deliver new precast pier cap to jobsite and set into place. 
  • Field Support 

Services Provided

Bridge Float-In/Float-Out, Falsework, Heavy Civil, Highway Bridges, Pedestrian Bridges, Temporary Construction Bridge, Temporary Work

Completion

2024

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

MDOT S10 Bridge Deck Removal

Portal North Bridge Erection 

McClugage Bridge 

Repairs to Old Hwy 182 over the Tuscumbia River 

BNSF Bridge 66.4 over Little Salmon River 

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

SH249 / SH99 Interchange

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement

Dublin Link Pedestrian Bridge 

Repairs to Old Hwy 182 over the Tuscumbia River 

Margaret McDermott Pedestrian Bridges

Mockingbird Pedestrian Bridge 

Portal North Bridge Erection 

Loxahatchee River Bridge Flying Jump Span

Lewis and Clark Viaduct Replacement

Route 17 Pier Demolition 

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement