Repairs to Old Hwy 182 over the Tuscumbia River
Client
Malouf Construction
Owner
City of Columbus, MS
Location
Columbus, MS
about
- Develop temporary support for approach spans to facilitate removal of the existing damaged concrete pier
- Design temporary dewatering falsework to allow for drilled shaft installation and preparation
- Design floating support system to deliver new precast pier cap to jobsite and set into place.
- Field Support
Services Provided
Bridge Float-In/Float-Out, Falsework, Heavy Civil, Highway Bridges, Pedestrian Bridges, Temporary Construction Bridge, Temporary Work
Completion
2024