Champ Clark Bridge over the Mississippi River 

Client

Massman Construction 

Owner

Missouri Department of Transportation 

Location

Louisiana, Missouri 

about

  • Demolition engineering for deck removal from existing bridge 
  • Design of Temporary Support structure for dismantling truss span over railroad 
  • Engineering for section preparations for blasting demolition 

Services Provided

Falsework, Heavy Civil, Highway Bridges, Specialty Rigging, Temporary Work

Completion

2019

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

MDOT S10 Bridge Deck Removal

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

SH249 / SH99 Interchange

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement

Portal North Bridge Erection 

Ramp G (KDOT Br. 854) Construction

McClugage Bridge 

Loxahatchee River Bridge Flying Jump Span

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement