Bagley Avenue Pedestrian Bridge

Client

Toebe Construction 

Owner

Michigan Department
of Transportation

Location

Detroit, MI

about

  • Staged Erection Analysis
  • Design of Falsework Structures and Temporary Sheet Pile Wall
  • Erection Manual Assembly
  • Stress Analysis

    Services Provided

    Falsework & Temporary Work, Geometry Control, Pedestrian Bridge

    Completion

    2009

    Other Projects

    Hawk Falls Bridge

    Portal North Bridge Erection 

    Belden G. Bly Bridge Replacement

    Buck O’Neil Bridge Replacement

    Hawk Falls Bridge

    Portal North Bridge Erection 

    Belden G. Bly Bridge Replacement

    Buck O’Neil Bridge Replacement

    Hawk Falls Bridge

    Portal North Bridge Erection 

    Belden G. Bly Bridge Replacement

    Buck O’Neil Bridge Replacement

    Dublin Link Pedestrian Bridge 

    Repairs to Old Hwy 182 over the Tuscumbia River 

    Margaret McDermott Pedestrian Bridges

    Mockingbird Pedestrian Bridge 

    Hawk Falls Bridge

    Portal North Bridge Erection 

    Belden G. Bly Bridge Replacement

    Buck O’Neil Bridge Replacement