MLK Bridge Replacement

Client

National Engineering & Contracting Company

Owner

City of Toledo

Location

Toledo, Ohio

about

  • Demolition sequencing removal of bascule spans
  • Development of barge stability calculations for the float-in of new and float-out of existing bascule spans
  • Design of all falsework and cribbing on barges
  • Design of all falsework required for the erection of the new bascule spans
  • Development of balance calculations for CTWT concrete design
  • Design of the SPMT system and falsework
  • On-site construction services

Services Provided

  • Falsework & Temporary Works
  • Geometry Control
  • Moveable Bridges

Completion

2006

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement

Belden G. Bly Bridge Replacement

Loxahatchee River Bridge Flying Jump Span

Point-No-Point Bascule Bridge

Sarah Long Bridge Demolition 

Hawk Falls Bridge

Portal North Bridge Erection 

Belden G. Bly Bridge Replacement

Buck O’Neil Bridge Replacement