Maffa Way & Mystic Avenue 

Client

Skanska

Location

Boston, MA

about

  • Erection Engineering for Highway Bridge
  • Complex Girder Erection Sequence with low clearance
  • LiDAR 3D Geometry Study for crane clearance concerns

Services Provided

Highway Bridges, Specialty Rigging

Other Projects

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement

Hawk Falls Bridge

Portal North Bridge Erection 

MDOT S10 Bridge Deck Removal

Buck O’Neil Bridge Replacement

Portal North Bridge Erection 

Ramp G (KDOT Br. 854) Construction

McClugage Bridge 

Loxahatchee River Bridge Flying Jump Span