by fourcegroup | Jun 4, 2026
Portal North Bridge Erection Client Skanska Traylor Joint Venture Owner NJ Transit Location Secaucus, NJ about Staged analysis for arch erection on temporary falsework at an offsite marine facility Designed strut system to allow arch to be picked up with SPMT’s ...
by fourcegroup | Jun 4, 2026
Loxahatchee River Bridge Flying Jump Span Client Scott Bridge Company Owner Florida Department of Transportation Location Jupiter, Florida about Designed a fully operational temporary bridge structure (called the Flying Jump Span) to AREMA specifications to allow a...
by fourcegroup | Jun 4, 2026
Lewis and Clark Viaduct Replacement Client American Bridge Owner Kansas Department of Transportation Location Kansas City, Kansas about Bridge Demolition Engineering & Explosive Demo Analysis Railroad-Adjacent Demolition Structural Analysis Cofferdam Design for...
by fourcegroup | Jun 4, 2026
Route 17 Pier Demolition Client United Demolition Owner SCDOT Location Georgetown, SC about Performed demolition analysis of the existing Piers to be demolished while still under the existing Rte 17 bridge over of the Waccamaw River. Developed required falsework...
by fourcegroup | Jun 4, 2026
Repairs to Old Hwy 182 over the Tuscumbia River Client Malouf Construction Owner City of Columbus, MS Location Columbus, MS about Develop temporary support for approach spans to facilitate removal of the existing damaged concrete pier Design temporary dewatering...