by fourcegroup | Jun 4, 2026
Champ Clark Bridge over the Mississippi River Client Massman Construction Owner Missouri Department of Transportation Location Louisiana, Missouri about Demolition engineering for deck removal from existing bridge Design of Temporary Support structure for...
by fourcegroup | Jun 4, 2026
Commonwealth Avenue Bridge Replacement Client Walsh Construction Owner MASSDOT Location Boston, MA about Replacement of the Commonwealth Ave Bridge took place over two separate two-week closures during the summers of 2017/2018. Crews worked around the clock to...
by fourcegroup | Jun 4, 2026
Daniel Carter Bridge Rehabilitation Client The Great Lakes Construction Co. Owner Ohio Department of Transportation Location Cincinnati, Ohio about Analysis of damage from an extreme thermal loading event on steel girders and deck. Development and evaluation of...
by fourcegroup | Jun 4, 2026
Route 17 Pier Demolition Client United Demolition Owner SCDOT Location Georgetown, SC about Performed demolition analysis of the existing Piers to be demolished while still under the existing Rte 17 bridge over of the Waccamaw River. Developed required falsework...
by fourcegroup | Jun 4, 2026
I-475 Bridge Rehabilitation Client C.A. Hull Co., Inc. Owner Michigan Department of Transportation Location Flint, Michigan about Performed construction engineering for several bridge rehabilitation projects along the I-475 corridor Developed engineered demolition...