by fourcegroup | Jun 4, 2026
Commonwealth Avenue Bridge Replacement Client Walsh Construction Owner MASSDOT Location Boston, MA about Replacement of the Commonwealth Ave Bridge took place over two separate two-week closures during the summers of 2017/2018. Crews worked around the clock to...
by fourcegroup | Jun 4, 2026
I-475 Bridge Rehabilitation Client C.A. Hull Co., Inc. Owner Michigan Department of Transportation Location Flint, Michigan about Performed construction engineering for several bridge rehabilitation projects along the I-475 corridor Developed engineered demolition...
by fourcegroup | Jun 4, 2026
Repairs to Old Hwy 182 over the Tuscumbia River Client Malouf Construction Owner City of Columbus, MS Location Columbus, MS about Develop temporary support for approach spans to facilitate removal of the existing damaged concrete pier Design temporary dewatering...
by fourcegroup | Jun 4, 2026
Maffa Way & Mystic Avenue Client Skanska Location Boston, MA about Erection Engineering for Highway Bridge Complex Girder Erection Sequence with low clearance LiDAR 3D Geometry Study for crane clearance concerns Services Provided IMG_0517 IMG_0511 IMG_0383 (1)...
by fourcegroup | Jun 4, 2026
FMM Tainter Gate Construction Client BCI Construction USA, Inc Owner US Army Corps of Engineers Location Fargo, ND about Construction engineering for new tainter gates Temporary support for gate frames Gate erection sequence Geometry control devices and rigging...