Repairs to Old Hwy 182 over the Tuscumbia River 

Repairs to Old Hwy 182 over the Tuscumbia River 

Repairs to Old Hwy 182 over the Tuscumbia River  Client Malouf Construction Owner City of Columbus, MS  Location Columbus, MS  about Develop temporary support for approach spans to facilitate removal of the existing damaged concrete pier  Design temporary dewatering...
Harry W Nice/Thomas “Mac” Middleton Bridge

Harry W Nice/Thomas “Mac” Middleton Bridge

Harry W Nice/Thomas “Mac” Middleton Bridge Client Maryland DOT Owner United Infrastructure Group about Construction (demolition) engineering for highway bridge Developed complex procedures to facilitate the demolition of multiple bridge structures including demolition...
FMM Tainter Gate Construction

FMM Tainter Gate Construction

FMM Tainter Gate Construction Client BCI Construction USA, Inc Owner US Army Corps of Engineers Location Fargo, ND about Construction engineering for new tainter gates Temporary support for gate frames Gate erection sequence Geometry control devices and rigging...
Second Ave North Approach – Br. S01 Girder Erection 

Second Ave North Approach – Br. S01 Girder Erection 

Second Ave North Approach – Br. S01 Girder Erection  Client C.A. Hull Co., Inc. Owner Detroit Regional Convention Facility Authority Location Detroit, MI about Erection Engineering for highway bridge  Complex Girder Erection study with Falsework Towers Performed...
Miller Road / Rotunda Drive Bridge Demolition 

Miller Road / Rotunda Drive Bridge Demolition 

Miller Road / Rotunda Drive Bridge Demolition  Client C.A. Hull Co., Inc.  Owner Michigan Department of Transportation Location Dearborn, MI about Evaluated the existing structure for heavy machinery operations used to facilitate concrete deck and steel superstructure...