Portal North Bridge Erection 

Portal North Bridge Erection 

Portal North Bridge Erection  Client Skanska Traylor Joint Venture Owner NJ Transit Location Secaucus, NJ about Staged analysis for arch erection on temporary falsework at an offsite marine facility Designed strut system to allow arch to be picked up with SPMT’s  ...
Loxahatchee River Bridge Flying Jump Span

Loxahatchee River Bridge Flying Jump Span

Loxahatchee River Bridge Flying Jump Span Client Scott Bridge Company Owner Florida Department of Transportation Location Jupiter, Florida about Designed a fully operational temporary bridge structure (called the Flying Jump Span) to AREMA specifications to allow a...
LIRR 150th Street Bridge Launch

LIRR 150th Street Bridge Launch

LIRR 150th Street Bridge Launch Client Integrated Structures Owner MTA Location Queens, NY about Evaluated the permanent box girders for launch effects  FEM shell modeling of bridge and staged launch analysis  Designed launch track, push sleds and longitudinal jacking...
Laredo-to-Nuevo Structures

Laredo-to-Nuevo Structures

Laredo-to-Nuevo Structures Client OCCI, Inc. Owner Canadian Pacific Kansas City Location Laredo, TX about Transverse slide and longitudinal launch of six DPG spans over the Rio Grande River in Laredo, TX  Spans were erected on falsework towers and transported via SPMT...
Point-No-Point Bascule Bridge

Point-No-Point Bascule Bridge

Point-No-Point Bascule Bridge Client George Harms Construction, Inc. Owner Conrail Location Newark, NJ about Bascule Span Erection Sequencing & Construction Engineering Temporary Works Design Including Support Towers, Falsework & Stability Bracing...