Ramp G (KDOT Br. 854) Construction

Ramp G (KDOT Br. 854) Construction

Ramp G (KDOT Br. 854) Construction Client Dondlinger Construction Owner Kansas Department of Transportation  Location Wichita, Kansas about Girder erection engineering for 3-unit curved girder bridge  Temporary falsework tower design  Lifting & rigging analysis ...
Dublin Link Pedestrian Bridge 

Dublin Link Pedestrian Bridge 

Dublin Link Pedestrian Bridge  Client City of Dublin,Ohio  Owner City of Dublin,Ohio  Location Dublin, Ohio about Design Plan and Specification review at 30%, 60%, and Final Design phases of the project  Assisted the Owner in Contractor Selection Phase  Reviewed...
Repairs to Old Hwy 182 over the Tuscumbia River 

Repairs to Old Hwy 182 over the Tuscumbia River 

Repairs to Old Hwy 182 over the Tuscumbia River  Client Malouf Construction Owner City of Columbus, MS  Location Columbus, MS  about Develop temporary support for approach spans to facilitate removal of the existing damaged concrete pier  Design temporary dewatering...
Margaret McDermott Pedestrian Bridges

Margaret McDermott Pedestrian Bridges

Margaret McDermott Pedestrian Bridges Client Huitt-Zollars  Owner Texas Department of Transportation Location Dallas, TX about Developed fabrication camber for arch and tie-girder structures Erection engineering for pedestrian bridge Performed independent check of...
Mockingbird Pedestrian Bridge 

Mockingbird Pedestrian Bridge 

Mockingbird Pedestrian Bridge  Client Rebcon, Inc.  Owner City of Dallas (Parks Department) Location Dallas, TX about Sequential Erection Analysis Hanger Fabrication Length Calculations Backstay Hanger Stressing Analysis Lifted Segment Weight & Center of Gravity...