by fourcegroup | Jun 4, 2026
Ramp G (KDOT Br. 854) Construction Client Dondlinger Construction Owner Kansas Department of Transportation Location Wichita, Kansas about Girder erection engineering for 3-unit curved girder bridge Temporary falsework tower design Lifting & rigging analysis ...
by fourcegroup | Jun 4, 2026
Dublin Link Pedestrian Bridge Client City of Dublin,Ohio Owner City of Dublin,Ohio Location Dublin, Ohio about Design Plan and Specification review at 30%, 60%, and Final Design phases of the project Assisted the Owner in Contractor Selection Phase Reviewed...
by fourcegroup | Jun 4, 2026
Repairs to Old Hwy 182 over the Tuscumbia River Client Malouf Construction Owner City of Columbus, MS Location Columbus, MS about Develop temporary support for approach spans to facilitate removal of the existing damaged concrete pier Design temporary dewatering...
by fourcegroup | Jun 4, 2026
Margaret McDermott Pedestrian Bridges Client Huitt-Zollars Owner Texas Department of Transportation Location Dallas, TX about Developed fabrication camber for arch and tie-girder structures Erection engineering for pedestrian bridge Performed independent check of...
by fourcegroup | Jun 3, 2026
Mockingbird Pedestrian Bridge Client Rebcon, Inc. Owner City of Dallas (Parks Department) Location Dallas, TX about Sequential Erection Analysis Hanger Fabrication Length Calculations Backstay Hanger Stressing Analysis Lifted Segment Weight & Center of Gravity...