Wind River Truss Replacement

Wind River Truss Replacement

Wind River Truss Replacement Client Advanced American Construction Owner Burlington Northern Santa Fe Railroad Location Carson, WA  about Prime Contractor – Hamilton Construction On-Water Specialist Sub-Contractor – Advanced American Construction (AAC)  Heavy Lift...
TRRA Merchants Bridge

TRRA Merchants Bridge

TRRA Merchants Bridge Client Walsh Construction  Owner Terminal Railroad Association  Location St Louis, MO  about Hoisting Analysis of Existing Structure. Barge Stability Analysis. Truss Erection Plan. Demolition Analysis. Temporary Falsework Design. On-site field...
KY 152 Kennedy Mill Bridge replacement 

KY 152 Kennedy Mill Bridge replacement 

KY 152 Kennedy Mill Bridge replacement  Client Walsh Construction  Owner Kentucky Transportation Cabinet  Location Harrodsburg, KY  about Engineered a floating platform and lowering system used for construction of the center pier located in a 200-ft deep section of...
BNSF Des Allemands Swing Span Replacement

BNSF Des Allemands Swing Span Replacement

BNSF Des Allemands Swing Span Replacement Client OCCI  Owner BNSF Railroad Location Des Allemands, LA about Engineered short-duration bridge replacement using span float-in / float-out techniques Barge stability analysis & floatation engineering Engineered gantry...
Long Island Bridge Demolition 

Long Island Bridge Demolition 

Long Island Bridge Demolition  Client Walsh Construction  Owner City of Boston Location Boston, MA about Truss Analysis for Float Out Condition Flasework Design Barge Stability Analysis Barge Lashing Design Approach Truss Pre-cutting Analysis for Explosive Dem...