Project Description
MLK Bridge Replacement
Location: Toledo, Ohio
Owner: City of Toledo
Work Description:
- Demolition sequencing removal of bascule spans
- Development of barge stability calculations for the float-in of new and float-out of existing bascule spans
- Design of all falsework and cribbing on barges
- Design of all faslework required for erection of the new bascule spans
- Development of balance calculations for CTWT concrete design
- Design of the SPMT system and falsework
- On-site construction services