Project Description
Herrington Lake Bridge Replacement
Location: Harrodsburg, KY
Owner: Kentucky Transportation Cabinet
Work Description:
- Engineered a floating platform and lowering system used for construction of the center pier located in a 200-ft deep section of the lake
- Staged erection analysis of new bridge construction
- Single girder and system buckling analysis performed for critical stages of steel girder erection
- Falsework tower design for construction of new girders
- Stability of barges during truss span removal